| The Hotel/Apartment building includes a ground floor plus 2 upper levels built over the entire site to form a podium from which the separate Hotel and Apartment towers are built over. A common gymnasium and swimming pool facility on Level 2 is accessible to both Hotel and Apartment occupants.
All building services were provided by Lucid. Key features include fully integrated room controls with energy minimising features, heat recovery ventilation of hotel floors and bathrooms, rainwater harvesting and reuse and communications cabling structure to cater for all latest in-room services.
The apartment building incorporates inverter air conditioning, efficient lighting and water efficient toilet fixtures.
|