| The design required interfacing with the existing services and delivery of the project with minimal disruption to the fully functioning base.
The site power supply has been upgraded to cater for new full building air conditioning and the site has been equipped with its own dedicated standby generator.
The construction of these specialist systems will ensure this important facility can remain fully functional during adverse conditions including mains power failure. |